Skip to content

Revised railway schedule for Augustburg-Ingolstadt route

Train connection disruptions expected for Bavarian commuters due to construction works by DB InfraGO AG from September 10th to 11th.

Alterations in local train schedules impacting journeys between Augsburg and Ingolstadt
Alterations in local train schedules impacting journeys between Augsburg and Ingolstadt

Revised railway schedule for Augustburg-Ingolstadt route

On September 10-11, 2025, construction work by DB InfraGO AG will impact train connections on the Bavarian Regional Railway (BRB), particularly the Augsburg - Ingolstadt route. Passengers should expect changes to their travel times, possible rail replacement traffic, and timetable deviations.

During this period, tram 6, which starts and ends at Friedberger Straße (Hochzoll Mitte), may become an essential part of your journey. Friedberger Straße stop is conveniently located, approximately a five-minute walk from Augsburg-Hochzoll station.

For those who prefer public transport, BRB offers an option to subscribe to a newsletter with individual route selection on their website. This service will keep you updated on any changes to your specific route during the construction period.

It's important to note that trams and buses may run at different times than the scheduled trains during this period. Passengers are advised to check the special timetables for the affected routes, available for download on the official BRB website at www.brb.de.

While a technical fault on the route from Regensburg to Ingolstadt has been resolved, there will still be night-time disruptions with rail replacement traffic (RRT) using buses and tram 6 on the Augsburg - Ingolstadt route.

Other construction sites with impacts on different routes during September 2025 are also reported, including cancellations, bus replacements, and route changes on several lines in Bavaria and beyond. Passengers are encouraged to stay informed and plan their journeys accordingly.

Remember, train connections not listed in the special timetable will run without deviation from the regular timetable on all days.

Stay updated and plan ahead to ensure a smooth journey during the construction work on September 10-11, 2025.

Read also:

Latest